In week 5 we conducted research regarding stormwater management using the databases available through Drexel University's library website.  In addition, we scaled the project area using Google Earth to acquire the elevation change and length of the major project site.  Sketching on top of a satellite picture of the site, we developed design plans for the chosen location. As the designs are refined, they will be scaled to real life proportions, including detailed design components.

Site of Project

Rough Design Representation
Key:
--------  Planters & Trenches
--------   Underground Pipes --------         Sidewalk Drains--------       Porous  Concrete 